Greenland Southside Integrated Pipe System Water Project
Estimated Dates & Work Schedule
Anticipated End Date: 2026-03-27
Monday through Friday, 7:00 a.m. to 5:00 p.m.*
Project Objective
A contractor working for JEA (Garney Construction) recently completed work to construct a new water transmission pipeline between two major water treatment grids located in JEA’s Duval County service territory. This project allows JEA the ability to transport excess water supply from the north side of the St. Johns River to the south side of the river to better meet increased potable water demand in the southerly portion of the JEA service area.
The new water transmission line has resulted in a direct offset of water withdrawal from the South Grid. This project has promoted conservation of the Floridian aquifer by lessening JEA's water resource withdrawal demand from its southern raw water well fields.
This project involved the installation of approximately 41,200 feet of 30-inch ductile iron water main from the JEA electric easement at the end of Validus Drive to the Greenland Water Treatment Plant on Philips Hwy (US 1). Additionally, JEA installed 12,900 feet of 30-inch reclaimed water main to support future development in the area.
Construction Conditions
Construction occurred in City and State rights-of-way and easements, and within the electric transmission line easement(s) located near homes and businesses. For the safety of crews and the general public, temporary road closures and detours were required while work progressed along the project route. During the course of this work, access to residences and businesses was maintained. JEA sent emails to notify residents directly impacted by these temporary road closures and detours in advance.
Overall Project Area Progress Map

Planned Water Outages
Some customers may have experienced minor interruptions to their water service. JEA notifies customers at least 48 hours prior to any planned water outages.
Restoration of the Project Area
Restoration of the project area typically begins soon after the project has been completed. Any existing grass, sprinklers, pavement, curb, gutter, driveways and/or sidewalks affected during construction will be returned to its pre-construction condition.
SIPS Pipeline Install in Easement

Contact
-